Cape Ann is already experiencing climate change. These 27 vignettes show how Cape Ann’s critical infrastructure, beloved cultural landscapes and historic downtowns are changing before the storm arrives.
Poplar Park
Gloucester, MA
dam, evacuation, public safety, preparedness, retention
Poplar Park is a housing development for elderly residents in Gloucester. The development includes seventy-six one-bedroom apartments built by the Gloucester Housing Authority (GHA) in the 1960s. The development is one of eight affordable and elderly housing developments operated by the Gloucester Housing Authority on Cape Ann.1 2

Poplar Park is located within the Mill River flood area directly downstream of the Babson Reservoir Dam. It was evacuated in 2006 due to the risk of the dam overflowing or collapsing.2 Despite rehabilitation improvements, the Babson Reservoir Dam is still considered a high potential hazard.3

Elderly residents are particularly at risk if communications systems fail during the Great Storm.4 To protect residents, Poplar Park is equipped with emergency generators in the community buildings, where residents could cluster in the event of a large storm.5 If these generators flood, residents will lose contact with emergency services. While Poplar Park is located close to Addison Gilbert Hospital, a critical resource for any persons injured during a storm event, the roadway leading to the hospital (Poplar Street) is at risk of flooding from Route 128 to Maplewood Avenue.6 This could strand residents at Poplar Park without a safe evacuation route and at a great risk of major flooding. If the Babson Reservoir overtops, it will spill floodwaters at high speeds down the Mill River floodplain, inundating emergency equipment at the nearby Public Works compound that the residents of Poplar Park, and Gloucester citizens more broadly, will rely on during and in the aftermath of a great storm.
“Poplar Park,” Gloucester Housing Authority, 2020. ↩
Metropolitan Area Planning Council, City of Gloucester Hazard Mitigation Plan 2020 Update (Gloucester: Metropolitan Area Planning Council, 2020), 36. ↩ ↩
Metropolitan Area Planning Council, City of Gloucester Hazard Mitigation Plan 2020 Update (Gloucester: Metropolitan Area Planning Council, 2020), 41 and 81. ↩
Metropolitan Area Planning Council and City of Gloucester, Gloucester Community Resilience Workshop Summary of Findings (Gloucester: Municipal Area Planning Council and City of Gloucester, June 30, 2018), 13. ↩
Gloucester Housing Authority, 2020 Annual Report (Gloucester: Gloucester Housing Authority, 2020), 5. ↩
Kleinfelder, Coastal Climate Change Vulnerability Assessment and Adaptation Plan (Gloucester: Kleinfelder, June 29, 2015), 76. ↩
Addison Gilbert Hospital and Seacoast Nursing and Rehabilitation Center
Blackburn Industrial Park (Wind Turbines)
Eastern Point (Dog Bar Breakwater)
Essex Causeway (Woodman's Landing)
Fernwood Lake Emergency Reservoir West Dam
Great Marsh (Cogswell’s Grant)
Old First Parish Burying Ground
Riverdale Electrical Substation
Rockport’s Inner Harbor (Motif No. 1)
Route 127 Causeway at Goose Cove
“The Cut” Bridge at Blynman Canal
West Gloucester Wastewater Treatment Plant